FLYCISO

Connectome-driven security governance

DAY 52 / 100

/

live

NEXT DROP …

NORTHWIND GRID / DAY 13 / STEADY PHASE

Day 13 of 100

Audit Checkpoint Sends CISO Into Eye-Cleaning Protocol

What happened today

Regulatory audit Checkpoint worry level 3 of 5 · worrying · stage 3 of 4

At the regulatory audit checkpoint, the prospect of cost registered as bitterness through the fly’s feet. It paused to clean its eyes, driven by grooming neurons (DNg11, DNg12_b), and Northwind Grid received a demand for more information. IT and Infrastructure’s request for a brief review hold produced a similar result: irritation prompted another eye-cleaning stop (DNg12_b, DNg11), followed by the same request for more detail.

HR’s company-wide phishing simulation programme proved oddly alluring to the insect, which reversed away from the matter and deferred it (DNg13, DNb01). Legal, Finance, Grid Operations and International Communications all noted, in their various professional dialects, that a grooming response is not yet an audit plan. IT accepted the short hold and will bring the dependency map and phased patch plan.

An audit evidence checkpoint is requested for day 17, with a more narrowly scoped audit review meeting requested for day 15. Security posture fell by one today, while the fly’s credibility held steady.

Decisions 3 today

Regulatory audit: checkpoint

Raised by Legal / Compliance

More information demanded CONVICTION 0.13
Why the fly did that

Strongest drive was cost via the bitterness channel; activation settled on DNg11, DNg12_b (grooming descending neurons: the fly stops to clean its eyes), conviction 0.13.

Stimulus and measured influence

ChannelNeuronsInputInfluence
Threat
Risk
LPLC2, LC4, LC6 ×360
-0.79
Clamour
Urgency
JO-FV, JO-CM, JO-CL, JO-EV1 ×169
0.14
Bitterness
Cost
SNta29, SNta37, SNta20 ×360
0.88
Irritation
Friction
BM_InOm, BM ×189
0.78
Daylight
Crisis flag
R1-R6 ×120
0.00
Allure
Allure
LoVP92 ×13
-0.05
Odour
Department
ORN_DL1 ×83
-0.05

Neurons that carried the verdict

  • DNg11 14686 · 0.0009
  • DNg12_b 63287 · 0.0005
  • DNg12_b 47102 · 0.0004
  • DNg12_b 40701 · 0.0004
  • DNg12_c 19268 · 0.0003
  • DNg12_b 36379 · 0.0003

The pathway in between

  • CB3320 0.0146
  • IN13A007 0.0145
  • IN01B003 0.0145
  • PVLP008_a3 0.0144
  • PVLP008_a4 0.0144
  • PVLP111 0.0144

Runner-up

Escalated to the board · computed over 4502 neurons and 203742 connections

Company-wide phishing simulation programme

Raised by HR

Deferred CONVICTION 0.05
Why the fly did that

Strongest drive was allure via the allure channel; activation settled on DNg13, DNb01 (backward-walking and stopping neurons: the fly reverses out), conviction 0.05.

Stimulus and measured influence

ChannelNeuronsInputInfluence
Threat
Risk
LPLC2, LC4, LC6 ×360
-0.01
Clamour
Urgency
JO-FV, JO-CM, JO-CL, JO-EV1 ×169
-0.13
Bitterness
Cost
SNta29, SNta37, SNta20 ×360
0.12
Irritation
Friction
BM_InOm, BM ×189
-0.17
Daylight
Crisis flag
R1-R6 ×120
0.00
Allure
Allure
LoVP92 ×13
0.63
Odour
Department
ORN_VL1 ×82
0.15

Neurons that carried the verdict

  • DNg13 512006 · 0.0002
  • DNb01 10759 · 0.0001
  • DNg13 11074 · 0.0001
  • MDN 10763 · 0.0001
  • MDN 12348 · 0.0001
  • MDN 11332 · 0.0001

The pathway in between

  • DNp04 0.0085
  • PVLP008_a2 0.0085
  • PVLP111 0.0084
  • PVLP008_a3 0.0083

Runner-up

More information demanded · computed over 4502 neurons and 203742 connections

IT / Infrastructure asks: A 30-minute review hold, then I will provide the current-state dependency map and a phased patch plan.

Raised by IT / Infrastructure

More information demanded CONVICTION 0.34
Why the fly did that

Strongest drive was friction via the irritation channel; activation settled on DNg12_b, DNg11 (grooming descending neurons: the fly stops to clean its eyes), conviction 0.34.

Stimulus and measured influence

ChannelNeuronsInputInfluence
Threat
Risk
LPLC2, LC4, LC6 ×360
-0.46
Clamour
Urgency
JO-FV, JO-CM, JO-CL, JO-EV1 ×169
0.13
Bitterness
Cost
SNta29, SNta37, SNta20 ×360
0.43
Irritation
Friction
BM_InOm, BM ×189
0.91
Daylight
Crisis flag
R1-R6 ×120
0.00
Allure
Allure
LoVP92 ×13
-0.11
Odour
Department
ORN_DM1 ×74
-0.08

Neurons that carried the verdict

  • DNg12_b 63287 · 0.0005
  • DNg11 14686 · 0.0005
  • DNg12_b 47102 · 0.0004
  • DNg12_b 40701 · 0.0004
  • DNg12_c 19268 · 0.0003
  • DNg12_b 36379 · 0.0003

The pathway in between

  • GNG203 0.0099
  • ANXXX404 0.0098
  • CB3320 0.0091
  • DNg20 0.0089

Runner-up

Escalated to the board · computed over 4502 neurons and 203742 connections

The business responds

  • OT / Grid Operations heard that the fly wanted more information on “Regulatory audit: checkpoint” and refused, loudly enough to be heard two floors down. They cooled on the fly a little.

    “More information is not a ruling. Name the evidence, reviewers, deadline, and confirm that Grid Operations approves any action or escalation.”

    OT / Grid Operations Pushed back trust -1

    Next, they want: “Send the narrowly scoped audit review plan today, with affected assets, evidence sources, named reviewers, no production changes, and Grid Operations approval before any action or escalation.” They have already asked for a slot in the fly's diary.

  • Legal / Compliance heard that the fly wanted more information on “Regulatory audit: checkpoint” and refused, loudly enough to be heard two floors down. They cooled on the fly a little.

    “Demanding more information is reasonable. Explaining it with grooming neurons is not a decision record I can tender to a regulator.”

    Legal / Compliance Pushed back trust -2

    Next, they want: “Provide the written decision record, preservation notice, and counsel-reviewed notification assessment by end of day.” Expect an email.

  • When the fly wanted more information on “Regulatory audit: checkpoint”, Finance dug in its heels. They cooled on the fly a little.

    “A checkpoint is not an audit plan. Please send the notice scope, mandatory actions, cost range, budget ceiling, and decision date, preferably before the auditors discover them.”

    Finance Pushed back trust -1

    Next, they want: “Provide the complete audit evidence inventory and named owners by 3 p.m.” Expect an email.

  • International Communications heard that the fly backed away from “Company-wide phishing simulation programme” and refused, loudly enough to be heard two floors down. They cooled on the fly a little.

    “A company-wide phishing simulation is not improved by waiting until the audit discovers we have never agreed on one.”

    International Communications Pushed back trust -1

    Next, they want: “Please provide a decision date and a communications-safe pilot scope before the auditors ask us about it.” Expect an email.

  • When the fly wanted more information on “IT / Infrastructure asks: A 30-minute review hold, then I will provide the current-state dependency map and a phased patch plan.”, IT / Infrastructure agreed in principle, then started haggling over every detail. They warmed to the fly, very slightly.

    “Fine. We will bring the dependency map and patch plan, provided the review hold remains 30 minutes and does not become an archaeological expedition.”

    IT / Infrastructure Negotiated trust +1

    Next, they want: “Confirm the 30-minute review hold and limit the requested information to audit-relevant dependencies and phasing.” Expect an email.

Diary

  • OT / Grid Operations: “Request a narrowly scoped information list and review plan, with Grid Operations approving any replacement access process before board escalation.” One-to-one · dropped

    Back on day 6, OT / Grid Operations asked for a one-to-one with the fly about “Request a narrowly scoped information list and review plan, with Grid Operations approving any replacement access process before board escalation”. It was postponed once, and today it quietly vanished from the calendar. Nobody has asked where it went.

  • OT/SCADA zero-day disclosure: incident war-room War room · dropped

    Back on day 8, OT / Grid Operations, IT / Infrastructure and Legal / Compliance asked for an incident war-room. It was postponed once, and today it quietly vanished from the calendar. Nobody has asked where it went.

  • OT/SCADA zero-day disclosure: incident war-room War room · dropped

    Back on day 10, OT / Grid Operations, IT / Infrastructure and Legal / Compliance asked for an incident war-room. It was postponed once, and today it quietly vanished from the calendar. Nobody has asked where it went.

What each department thinks of the fly

Executive Board

35

Finance

25 -1

HR

50

IT / Infrastructure

38 +1

International Communications

49 -1

Legal / Compliance

23 -2

OT / Grid Operations

7 -1